Zero-carbon park construction is not simply installing several photovoltaic panels, but a systematic energy and development planning project. Scientific top-level design is the prerequisite to avoid investment waste and ensure effective low-carbon transition.
| Service Item | Description |
|---|---|
| Park Carbon Inventory & Accounting | Full-caliber carbon emission accounting covering Scope 1 (direct emissions), Scope 2 (purchased electricity and heat) and Scope 3 (upstream and downstream industrial chains), and establishment of the baseline ledger of park carbon emissions. |
| Top-level Planning & Design for Zero-carbon Park | In accordance with national and local standards for zero-carbon parks, formulate phased carbon peaking and carbon neutrality targets and implementation roadmap, and define technical routes, key projects and investment schedule. |
| Carbon Policy Interpretation & Qualification Application | Interpret national and local policies for pilot programs including zero-carbon parks, green parks and near-zero carbon emission zones, and assist the park in application document preparation and review coordination. |
| Integrated Energy System Planning for Park | Coordinate the spatial layout and capacity configuration of distributed PV, energy storage, heat pumps, microgrids and other energy infrastructure, and design an integrated source-grid-load-storage solution. |
Copyright © Jiangsu Halidom New Energy (Group) Co., Ltd. All Rights Reserved. 苏ICP备14011569号-2
苏公网安备 32111202000329号